Phase 2 Scope of Work

Download Phase 2 Scope of Work document (05/20/2005, PDF 610k)
Phase 1 Scope of Work (12/01/2005, DOC 75k)

The draft scope of work for Phase 2 is organized into several major tasks: These tasks include data collection, mapping, development of a travel demand model, corridor analysis, scenario building, development of Memoranda of Understanding (MOUs), and Public/Agency Engagement.

Phase 2 of Gateway 1 is anticipated to take 24 months to complete.

Phase 2 Scope Outline

Task

Description

1.0 Base Mapping
Major Subtasks anticipated include:
  Aerial Mapping
  Right-of-Way/Utility Mapping
  Land Use/Zoning Mapping and Inventory
  Historical/Cultural and Natural/Physical Resources Maps
  Roadway Design Mapping
2.0 Collect Data & Build Travel Demand Model
Major Subtasks anticipated include:
  Origin and Destination Survey
  Traffic Data Collection
  Crash Data Collection and Analysis
  Create Travel Demand Model
  Identify Transit Opportunities
3.0 Conduct Analysis
Major Subtasks anticipated include:
  Review & Augment Socio-economic Analysis
  Review Town Comp Plans, Ordinances and Land Use Policies
  Visual Assessment Study
  Identify Relevant MaineDOT Studies/Projects in Pipeline
  Review Policies and Standards
  Case Study of Bypassed/Non-bypassed Towns in Corridors
  Estimate Build-out Potential
  Identify Early Action Items
  Agency review for NEPA/STPA Adequacy
4.0 Develop Alternative Corridor Scenarios
Major Subtasks anticipated include:
  Establish Cause-and-Effect Relationships
  Establish Stakeholder Values & Goals
  Sort Out "Givens" from "Indeterminates"
  Alternative Institutional Arrangements
  Create and Evaluate Scenarios (Scenario Building)
5.0 Develop Corridor Plan and Interlocal Agreements/MOUs
Major Subtasks anticipated include:
  Develop Draft and Final Plan
  MOU Development
6.0 Public/Agency Engagement
Major Subtasks anticipated include:
  Formation of Public Groups (TRPs, SGs, SC)
  Public Education Program
  Legislative Updates
  Ongoing Town Response Panel Management & Support
  Ongoing Subregional Group Management & Support
  Ongoing Steering Committee Management & Support
  Agency Policy Group Management & Support
  Ongoing Media Public Relations
  Interactive Website Updates and Maintenance